Projects
"Petrotechindo Utama Strives to execute all our projects with Quality, Time, Cost and Safety as our prime parameters"

The list of flagship projects below is a selection of project types in a cross section of geographical locations

PMC For Bitung – Cimanggis (CP-10) Pipeline Project - ONGOING
PT. Perusahaan Gas Negara (Persero) Tbk awards PMC Contract for PTU for CP-10 Pipeline project which was initiated as a support for market growth and industry to fulfill, improve and ensure natural gas supply in the West Java area.
The 24ӯ x 90.0 kilometer onshore high pressure distribution pipeline will also involve Pig Launcher and Receiver; Sectional Valves; Future Connections; Gas Off-take Station with Custody Metering System (including Gas Analyzer); Gas Filters; Control Valves; Shutdown Valves; Control Building; Telco Building, Accommodation Facilities ; Cathodic Protection System; and Fiber Optic Cable conduit (sub-ducts);
As the Project Management Consultant, PTU will be involved but not limited to providing expertise in overall project management, engineering, procurement supervision, construction supervision, commissioning, start-up & trial operation, operations maintenance, environmental monitoring, migas certification as well as project management information system.
The full scope of the PMC work is expected to be completed in twenty nine (29) months. The works starts from implementation of the EPC package tender and contract award, detail engineering works, procurement, construction, pre-commissioning, commissioning, up to commercial start-up operation of the pipeline system.

PMC For Labuhan Maringgai – Tanjung Karang (CP-7) Pipeline Project - ONGOING
In early 2013, PTU was awarded a Project Management Consultancy contract by PT. Perusahaan Gas Negara (Persero) Tbk. The project was initiated as a support for market growth and industries demand on energy within Lampung area, and particularly to deliver gas from LNG Receiving Terminal to Lampung Area through Labuhan Maringgai Offtake Station. This new onshore high pressure distribution pipeline project will involve a 16” onshore pipeline stretching approximately 62.3km and a 12” onshore pipeline stretching approximately 17.7km from Labuhan Maringgai to Tanjung Karang area. The project is estimated to be completed in sixteen (16) months.
As the Project Management Consultant, PTU will be involved but not limited to providing expertise in overall project management, engineering, procurement supervision, construction supervision, commissioning, start-up & trial operation, operations maintenance, environmental monitoring, migas certification as well as project management information system.

West Java FSRT (Floating Storage Regasification Terminal) Project - COMPLETED
PTU has been awarded a contract by PT. Nusantara Regas to provide services for Project Management Team of the West Java FSRT Project located in Muara Karang – West Java. The project which has an estimated total contract value of approximately USD 500Mn will be the first ever FSRT project in Asia and consequently the first LNG Regasification Terminal in Indonesia.
The Floating Terminal Facility comprises of Floating Storage Regasification Facility (FSRU), Subsea Pipeline and Onshore Receiving Facility (ORF). PTU will be involved starting from the engineering stage, detail design, construction supervision and commissioning with an estimated work completion schedule of 12 (twelve) months.
The project comprise of installation of pipes across an approximately 15km stretch with a diameter of 24” and will be conducted at depths of up to 22m below sea water in the Java sea. PT. Perusahaan Listrik Negara (Persero) has been identified as a main customer to utilize the gas as fuel to PLN’s power plant in fulfilling the growing electricity demand for Java and Bali.
PT. Nusantara Regas is a joint venture company between PT. Pertamina (Persero) and PT. Perusahaan Gas Negara (Persero)

Engineering Study for SPBG Multifunction Project
In 2011, PTU conducted Engineering Study activities for Stasiun Pengisian Bahan Bakar Gas (SPBG) Multifunction for PT. Perusahaan Gas Negara (Persero) Tbk. The engineering study resulted in Technical Reference for SPBG Design, Construction, Operation as well as Safety Requirements details.

PMC for Surya Cipta Compressed Natural Gas Station
PTU was appointed as Project Management Consultant for PT. Perusahaan Gas Negara (Persero) Tbk in 2010 to assist in managing the Surya Cipta CNG Station Project. The project was conceived to ensure steady state of gas distribution operation of the West Java Distribution Network Pipeline Systems and to be installed before PGN proceeds with signing of gas supply deals with several customers in the West Java region of Indonesia.
The PMC Services for CNG Project includes among others, project management, detail engineering design review, procurement supervision and coordination, construction supervision, precommissioning and commissioning, start up operation and environmental monitoring.

KP 110-KP 133, Kuala Tungkal – Panaran TGI Offshore Pipeline Repair
In strategic partnership with WorleyParsons Indonesia, Petrotechindo Utama was awarded the Project Management & Consultancy services contract by PT. Transportasi Gas Indonesia (TGI) for the replacement and zero-downtime repair of a 28-inch pipeline offshore at KP 110-KP 113 Kuala Tungkal – Panaran segment of TGI Offshore pipeline.
The repair was carried out without interruption of the gas flow and includes a total of eight hot tap installations to tie the new pipeline section to the existing pipeline. Additionally it utilizes a pipe lay barge assisted by additional support vessels to install the new 23 km section at Kuala Tungkal – Panaran ,Grissik-Singapore Pipeline.
The pipeline is of strategic and critical importance to both Indonesia and Singapore as it is a major source of gas supply to Batam Island and Singapore.

Technical Services for South Sumatera – West Java Gas Transmission Project Phase II Onshore
Petrotechindo Utama is subsequently entrusted to continue supporting our client by providing technical services for the project starting from Jan 2009 onward as a continuation of the South Sumatera- West Java Gas Transmission Project Phase II Project Management and Consultancy Services.

South Sumatera – West Java Gas Transmission Project Phase II Onshore
In association with Penspen Limited (UK), Petrotechindo Utama was appointed as Project Management Consultant by PT. Perusahaan Gas Negara (Persero) Tbk for the South Sumatera- West Java Gas Transmission Project Phase II Onshore. The project involved the construction of 661 km onshore Pipeline ranging from 24” diameter to 36” diameter high pressure natural gas pipelines from Grissik in South Sumatera province to Rawa Maju in West Java province with a capacity up to 462 mmcsfd. Petrotechindo Utama successfully delivered our service ranging from the conceptual stage to operations stage and achieved a milestone award for 1,399,236 total working hours without lost time injury.

Petronas Gas GT Fuel Upgrade, Malaysia
Design Engineering, Supervision of Construction and Commissioning was completed in March 2004. The project was conducted in association with Pietro Fiorentini SpA (Italy)

Gas Receiving/Metering Stations and Offtake Development, Singapore
Located in Sakra,Singapore, Petrotechindo Utama successfully completed Design Engineering, Supervision of Construction and Commissioning for Gas Receiving/Metering Stations and Offtake Developments.

Offtake Station Installation – Riau, Indonesia
Over a period of one year, in association with PT.Yuan Sejati, Petrotechindo Utama completed Design Engineering, Detail Design and Supervision of Construction

Gas Metering & Regulating Station, Jakarta – Indonesia
Appointed by PT.Gikoko Kogyo to complete Design & Detail Engineering and Drawings for the Gas metering and Regulating stations

Mixed Gas & Compressed Air Pipings – Jakarta, Indonesia
Appointed in 2004, Petrotechindo Utama completed Design & Detail Engineering and Drawings for the Mixed Gas and Compressed Air Pipings